The idea of using the former King’s Court plot as a site to build an outstanding and representative building for the Czech kingdom’s capital was first initiated by a Prague Civic Society memorandum, submitted to the Town Hall authorities in 1901. The request proposed the creation of a center for Czech official and social undertakings, citing among other reasons the necessity for a counterbalance to a German casino and the German House (now Slovanský dum — the Slavic House) on Na Príkope Street.
|
 |
|
In 1903 an architectural competition took place. Three designs by the architects Dryak, Pospísil and Balsanek received awards, but not even the second round of the competition produced a winning design and so the Prague City Council decided that the architects Professor Antonín Balsanek and Osvald Polívka would be commissioned for the project. The work was supervised by a ninemember committee which included councillor Prof. Josef Schulz, architect Jirí Stibral and architect Vaclav Rostlapil.
|
 |
|
The final design and a 3,000,000 crown budget were finally approved after a series of delays on 10 December 1904, and in the summer of 1905 the firm Schlaffer & Sebek began the construction work. Some of the sections were put into use as early as 1909—1910 while the entire building was officially opened on 22 November 1912.
The Municipal House is one of the most remarkable constructions of Prague Art Nouveau. At the time of its creation it was critisized by some architects as its style was considered to be formally outdated.
The lapse of almost a century since then allows us to forget about the emotions and controversy of those times and to appreciate this building as a unique harmony of architectural and painting styles of the turn of the 19th and 20th centuries. NeoBaroque, NeoRenaissance, and both Western and Oriental influences fuse together with Czech Art Nouveau. The impression this building gives is enhanced by a wide range of decorative styles and materials, as well as by the high quality of craftmanship. The monumental appearance of the building is crowned by the outstanding decor created by most of the prominent Czech artists of the day, namely the painters Mikolas Ales, Vaclav Jansa, Alfons Mucha, Jakub Obrovský, Jan Preisler, Josef Wenig, Karel Spillar, Max Svabinský, Josef Ullman, Frantisek Zenísek, and the sculptors Josef Maratka, Josef Vaclav Myslbek, Karel Novak, Ladislav Saloun, Frantisek Uprka, Bohumil Kafka and Cenek Vosmík.
|
 |
|
The building was equipped with all the modern facilities of the time, including central heating and ventilation, drinking and utility watersupply system, suction removal of dust, cooling of the cellar, icemaking, electrical as well as hydraulic elevators, steampowered laundry, laundry drying room, bottlewashing facility, transformer station, accummulator station, tube post and an intercom network.
Total costs amounted to 6,083,000 crowns, the built up area is 4,214 sqm and the volume of the building is 139,176 cubic meters.
|